Timber logic · assembly study 09
Wood frame · Tang study model
南禅寺大殿
Main Hall of Nanchan Temple
Wutai County · ShanxiTang period · 782 CE
A compact, single-eave timber hall study. Its posts, tie frame, bracket sets and tiled roof are shown as a legible construction sequence.
Interpretive model · not measuredMaterial study
NEW · 00 · fresh100 · weathered
Structural X-rayFade roof, screens and painted trim
FRAME CLOSED · X-RAY OFF
柱zhù · columns
Upright posts carry the roof weight down to stone footings.
枋fāng · tie-beams
Fang bind column heads and steady each structural bay.
梁liáng · beams
Main beams span the frame and pass roof loads to columns.
檩lǐn · purlins
Longitudinal purlins support rafters along the roof slope.
斗拱dǒugǒng · brackets
Layered brackets project the eaves and seat the roof frame.
椽chuán · rafters
Slender rafters fan from ridge to eaves beneath the tile deck.
Five lifts · frame order
- 01Columns柱
- 02Fang / tie-beams枋
- 03Beams + purlins梁 · 檩
- 04Dougong sets斗拱
- 05Rafters + roof椽
Roof complete
Complete frame · scrub the lift line to inspect a stageDrag to orbit · wheel to zoom
Reading the frame · Assemblies rise in five lifts; reverse lowers them in the opposite order. Hover a member to find its label.
Canvas unavailable
This study needs WebGL and a connection to the Three.js CDN. Enable WebGL or open it again while online.