Harbor operations / Dock 21

Skyhook Cargo

ON SHIFT
Swing angle
°
Load speed
m/s
Cable out
m
Contact
Settle hold
Trolley
Cable

Deliver to pad 02. Hold ← → or A/D to drive. Release to brake. Hold ↑ ↓ or W/S to reel. Hoist clear of the tower, then lower the whole crate onto the pad. Hold below 0.15 m/s and within 5° for 2 seconds. Space pauses.